
Otara Creek Catchment
Catchment
Background |
Catchment
Projects |
Catchment
Reports |
Catchment
Consents
Catchment Background Summary
Location
The Otara Creek Catchment is located mostly within the Otara Ward of the City of Manukau with a small portion of it in the Papatoetoe Ward and the upstream reaches within the Clevedon Ward
Total Catchment Area
3500 hectares
Sub Catchments
Click to enlarge this map
![]() |
|
|||||||||||||||||||||||||||
Comprehensive Discharge Registers
- 1995, Point View Comprehensive Discharge Register (PDF 1.48m)
- 1992, Flatbush Comprehensive Discharge Register (PDF 132k)
- 1990, Otara Stream, Flatbush Comprehensive Discharge Register (PDF 139k)
- 1978, Otara Stream Comprehensive Discharge Register (PDF 193k)
Catchment Background Details>>
Catchment Projects
- 2002 (October), Otara Lake Environmental Improvements & Regional Stormwater Project Update, Meritec Ltd
- 2000 (Sept), Otara Lake Improvement Project, Strategic Review, Worley
Catchment Reports
- 2004 (June) Flatbush Catchment Management Implementation Plan - Version 6
- Flat
Bush Catchment Management Plan (PDF 123k)
- Map sub catchment (PDF 2.70m)
- Appendix A - Maps (PDF 3.23m)
- Appendix B - Predevelopment (PDF 1.86m)
- Appendix C - Proposed Mitigation (PDF 50k)
- 2004 (June) Flatbush Catchment Management Implementation
Plan, Beca Cater Hollings and Ferner Ltd
- Main Document (PDF 126k)
- Appendix A (Maps) (PDF 3.32m)
- [Appendix B (Predevelopment) (PDF 1.91m)
- [Appendix C (Proposed Mitigtation) (PDF 50k)
- 2002 (August), Flatbush Catchment - Stormwater Quality Pond Concept Design, TSE Group Ltd
- 2002 (June), Bridge Waterway Analysis, Beca Carter Hollings and Ferner (PDF 2.10m)
- 2001 (May), East Tamaki Comprehensive Catchment Management
Plan
- Guidelines (PDF 194k)
- Report
- Final Document (PDF 5.03m)
- Development East Tamaki Area (PDF 1.17m)
- Stormwater Management Glossary (PDF 38k)
- Maps
- Map 1 - Study area and sampling sites (PDF 765k)
- Map 2 - Stream classification - ecological (PDF 798k)
- Map 3 - Existing landuse (PDF 839k)
- Map 4 - DET concept plan indicative areas only (PDF 975k)
- Map 5 - Parcel size assessment (PDF 793k)
- Map 6 - Landscape analysis (PDF 747)
- Map 7 - Catchment soils and geology (PDF 780k)
- Map 8 - Catchment modelling existing scenario (PDF 790k)
- Map 9 - Stormwater management concept future mitigated (PDF 851k)
- Map 10 - 1 percent AEP floodplain (PDF 911k)
- Map 11 - Town centre mitigation measures (PDF 1.15m)
- Map 12 - Restoration categories (PDF 1.00m)
- Map 13 (PDF 910k)
- Map 14 - DET structure plan MCC variation no 13 (PDF 1.04m)
- Appendices
- Appendix 1 - Landscape Unit Assessment Sheets (PDF 7.87m)
- Appendix 2 - Landscape Unit Photos (PDF 1.15m)
- Appendix 3 - Landscape features elements and nodes (PDF 1.36m)
- Appendix 4 - Hills Road mean flows and flow distribution (PDF 425m)
- Appendix 5 - Stormwater management options (PDF 672k)
- Appendix 6 - Stormwater management options (PDF 1.50m)
- Appendix 7 - Stormwater mitigation results phase 2 (PDF 387k)
- Appendix 8 - Results of riparian ecological assessments (PDF 7.12m)
- Appendix 9 - Macroinvertebrates (PDF 433k)
- Appendix 10 - Growth strategy invertebrates (PDF 65k)
- Appendix 11 - Species list - Murphys Bush and 140 Jeffs Road (PDF 1.35m)
- Appendix 12 - Stream photos (PDF 9.81m)
- Appendix 14 - Community consultation newsletters (PDF 1.94m)
- Appendix 15 - Landuse (PDF 1.19m)
- Appendix 16 - Maintenance costs for stormwater ponds (PDF 12.0m)
- Green finger cross sections (PDF 1.23m)
- 2001 (March), Otara Creek Catchment Discharge Consent Application. Comprehensive Catchment Study and Management Plan Options, GHD Ltd (PDF 637k)
- 2000 (August), Kerwyn Ave Catchment Stormwater Treatment - Discussion Document
- 2000 (June), Target Catchment Study Upper Otara Creek
- 2000 (March), Otara Lake Water Quality - Technical Report
- 2000 (March), Otara Lake Water Quality, Technical
Report, Worley
- 1999 (June), Flatbush Dam, Tomkin and Taylor Ltd.
- 1995 (July), The Dredging and Disposal of Sediment from Otara Lake, Kingett Mitchell and Associates.
- 1995, Comprehensive Flood Management Study (Draft), Otara Stream South Catchment, MCL
- 1991 (October), Point View Water Right, Auckland Regional Council (PDF 3.7k)
- 1991 (May) Point View Flood Management Plan, Auckland Regional Council.
- 1990 (Nov), Rongomai Road Flood Detention Works, Stage One, City of Manukau.
- 1988 (March), Flatbush Industrial Park Manukau City, Beca Carter Hollings and Ferner.
- 1988 (March), Engineering Report on Otara Stream Flat Bush Branch No.2, J. White.
- Otara/Flatbush Stormwater Management Study, Working Report No.34, Prepared by A.H. Snelder, Water Resources Engineer
- 1978
(February), Otara Stream Flat Bush Branch No.2 (PDF
7.62m)
- Locality Plan (PDF 4.41m)
- 1975 (August), Otara Stream Redoubt Road North Design Report. Manukau City Council.
Catchment
Consents
- 2007 (December), East Tamaki Resourse Consent (PDF 131k)
- ARC CN 25837 - 26 Springs Road, East Tamaki (PDF 388k)

