For queries on any of the projects below please email Manukau Parks.
Ballater Place playground renewal
Lloyd Elsmore Park athletics track
Lloyd Elsmore Park netball court development
Lloyd Elsmore Park traffic improvements
Rotary walkway footpath widening
Rotary walkway snakes and ladders playground development
Takutai Boardwalk
Ballater Place playground renewal
Location: Ballater Place, Highland Park
The existing playground will be renewed. View our
design drawings (PDF 419kb).
Status: works have begun, completion scheduled for June 2010.
back to top
Lloyd Elsmore Park athletics track

Location: 2R Bells Road, Pakuranga
This project involved the construction of a new athletics track with a synthetic surface.
Status: completed.
back to top
Lloyd Elsmore Park netball court development
Location: off Sir Lloyd Drive, Pakuranga
Stage 1
This project will see the development of additional netball courts and associated car parking.
Status: physical works are scheduled to be completed by June 2010.
Stage 2
Stage 2 sees the addition of six new courts to the netball complex.
Status: Detailed designs are being prepared. Physical works anticipated to commence in November 2010.
back to top
Lloyd Elsmore Park traffic improvements
Location: Sir Lloyd Drive, Pakuranga
Work is due to commence in September on traffic improvements around the netball courts, old depot and swimming pool. Further carparks will also be added.
Status: in the detailed design phase. Work is scheduled to commence in September 2010.
back to top
Rotary walkway footpath widening
Location: Rotary Walkway: Bramley Drive, Arkley Avenue, Davita Place and Estelle Place, Pakuranga
This project involves the widening of the existing narrow concrete walkway to two metres in width.
Stage1-Section A1
Footpath between Farm Cove Reserve (1km) and the existing bridge.
Status: Physical works completed end of January 2010.
Stage3-Section B
Footpath between 93R and 125R Fisher parade (450m) and timber retaining wall (133m).
Status: Under construction, delays due to weather, completion early September 2010.
Stage2-Section A2
Footpath between Farm Cove Reserve near Estelle Place and Rappallo Place (300m), timber retaining wall (60m) and upgrade of a bridge.
Status: Construction underway, completion mid-September 2010.
back to top
Rotary walkway snakes and ladders playground development

Location: Rotary walkway: Farm Cove Reserve, 38R Bramley Drive, Pakuranga
This project involved the development of a new playground on a steep bank. The playground reflects a snakes and ladders design theme where four slides, stepping beams and ladders recreate the children's game. Native planting is intermixed through the play area to tie in with the natural coastal setting.
Status: project completed.
Takutai Boardwalk
Location: Little Bucklands Beach to Takutai Avenue, Half Moon Bay
Work has commenced on a timber piled pedestrian/cycle boardwalk to improve access to the coastal environment and Half Moon Bay ferry and bus station.
The boardwalk starts on the foreshore at Little Bucklands Beach and closely follows the existing banks. It will also connect to Te Akau Crescent and the existing footpath at the end of The Parade.
Status: Physical works are underway, completion expected October 2010.
back to top